ALL Cable Pulling in Plant or Pipeline Rack

JOB DISCRIPTION

Cable pulling; Electrical cable, Instrument cable, Fiber optic cable or Etc.
  • Site survey
  • Take BOQ
  • Bidding
  • Purchasing
  • Engineering and Rout line cable
  • Site modify preparing, Cable Support, Cable Conduit, Cable Tray, Cable Ladder, ETC.
  • Cable Schedule
  • Cable Pulling
  • Cable Continue
  • Cable Test
resultPicture42

Project Based & Reference

Control System Job.

PLC

  • : TPE PLC REVAMP WH301 302 303 , BB703-704 ( Siemens )
  • : TMMA MODIFY CONVEYOR ( Mitsubishi )
  • : TPE Site#3 Revamp Control system for Cabinet CPD Line P05
  • : Conveyor Final Weight Scale

FLOW COMPUTER

  • PTTGC3 Flow Computer Remote Printing PROJECT
  • Flow Computer System Medco PROJECT
  • GC#5-Replace flow meter benzene PROJECT
  • : CNG Master meter PTT GSP PROJECT"
  • : Pentane from SAKC to OLE2-1 PROJECT"
  • : REVAMP FLOW COM (ABB-FLOW X) MEDCO PROJECT
  • : REVAMP FLOW COM (OMNI -7000) DOW-CHEMICAL PROJECT
  • : REVAMP FLOW COM Cabinet AT HMC PROJECT
  • : REVAMP FLOW COM Cabinet GC#4 PROJECT
  • : CIP-N Circular Plas PROJECT"
  • : Vent gas from Circularplas PROJECT"
  • : Butene1 pipeline between HMC&PTTGC PROJECT
  • : MOCI Project (4 Metering) PROJECT"
  • : DSAM_BXKC511 Flow Metering System PROJECT
  • : TPE Repair Flow Computer FIQ-5854 PROJECT
  • : BST Config Modbus Flow Computer 84FC-520 PROJECT
  • : SSM REPLACE FLOW COMPUTER 13FT-319AB OMNI DAMAGE

BATCH CONTROLLER

  • : MOC-CKB Truck Unloading PROJECT
  • : TMAA#3 Supply Batch Controller D-218 PROJECT

SCADA AND DCS SYSTEM

  • : ROC&MOC Auto Billing
  • : LOPA Project (E&I Install and DCS)
  • : PTTMCC E&I Work for Interface Level Switch (E&I Install and DCS)

GAS CHROMATOGRPHY ( GC Analyzer ) AND ANALYZER SYSTEM JOB.

  • : PIONA GC FOR NAPHTHA MOC PROJECT
  • : NBL2-IE42- Gas Chromatograph PROJECT
  • : NBL2-IE43- O2 PROJECT
  • : MOC GC 3+1 UNITS (MKII)
  • : Process Gas Chromatograph Analyzer M-ARA213
  • : Siemens Gas Chromatograph Maxum Edition 8 unit ROC
  • : GC 5 unit in ROC H1
  • : Service Overhaul Oxygen analyzer AT-1801
  • : Modify AT-1801
  • : TPC GC8000 GC ARA001 PVC5
  • : SDC_GC Improvement Project_M-ARA213
  • : TPE REVAMP GC ANALYZER 4 UNIT FOR PP3-HD4 PLANT
  • : GCM PTA Replace Flow computer FIQ-4410B

FIELD EQUIPMENT SERVICE AGING MODIFY AND NEW PROJECT INSTALLATION JOB.

Equipment Installation Job.

  • : TPE Transmiter Aging
  • : RIL Raw water bypass & Main
  • : RTC Improvement
  • : Revamp Auto Tank gauging TPC
  • : Installation Replace at RTC Plant
  • : Revamp Transmitter&Switch (MTT)
  • : LEVEL SERVO TANK GAUGE O-LI462A
  • : Aging Metering Plant PP3FT-6325AFT-010A , Aging Metering Plant PP3 FT-6326A
  • : Install new magnetic flow meter 4 Inch, 18 inch MOC
  • : Aging Management For FT701 mass flow TPE
  • : Emergency Inhibitor Supply Unit TMMA
  • : TPC Prother NMT81
  • : TPE Replacement Positioner 3730-6 SAMSON
  • : RCT Improvement Tank Reliability TK-1001
  • : TPC Proservo NMS81 & remote display Tank O-FA811B Tag O-LI812B
  • : TMMA Compressor temperature 2003 Voltor K-241

Tubing Fabrication and Modular Skid Job.

  • : MON Install tube
  • : MOC_Drilling Machine Coolant Tube Replacement (Ananda)
  • : BST-NBL2 SEAL WATER SKID PROJECT
  • : Spool piece flange connection (SS304) for Flushing
  • : งานเปลี่ยนและติดตั้ง tube fitting TPE#3

ALL Cable Pulling in Plant or Pipeline Rack Job.

  • : Repair Extension cable Temp COT furnace
  • : ROC Install Fiber Optic CCR to CCR waste
  • : Pulling signal cable & support Level transmitter (Jetty#1,2,4)
  • : TPE#1_AGING_LD-FT-594
  • : AGC RCA5 Pipeline PROJECT