TUBE AND FITTING
โพสต์เมื่อ : 20 ม.ค 2568 เวลา 8:38 น.
Tube and Fitting fabrication and Modular Skid
JOB DISCRIPTION
All Tube work for Instrument equipment or Modular skid Tubing- Site survey
- Take BOQ
- Bidding
- Purchasing
- Design and Engineering
- Site modify preparing, Tubing rout line 1/16", 1/8", 1/4", 1/2", 3/4"
- Fabrication
- Site Installation
- Fushing N2
- Pressure Test